The European Union resource adequacy assessment as an instrument to support the development of renewable energy sources and the achievement of decarbonisation targets

Ocena wystarczalności zasobów Unii Europejskiej jako instrument wsparcia rozwoju odnawialnych źródeł energii i realizacji celów w zakresie dekarbonizacji

Due to the growing mix of different types of dispersed generation, energy storage, energy efficiency and new promising technologies, in combination with traditional large scale fossil fuel electricity generation, ensuring reliability of electricity systems is increasingly challenging. The electricity demand is also in constant change because of the increased frequency of extreme weather events. In this regulatory environment, the European Union has proposed a single regulatory model to assess the security of the electricity system, in which a key role is played by long-term resource adequacy assessment. The aim of the article is to show this model, indicating what the policy implications are for the development of renewable energy sources and decarbonisation targets.

W związku z rosnącym udziałem różnych rodzajów generacji rozproszonej, akumulatorów, efektywności energetycznej oraz nowych obiecujących technologii, w połączeniu z tradycyjnym wytwarzaniem energii elektrycznej z paliw kopalnych na dużą skalę, zapewnienie niezawodności systemów elektroenergetycznych staje się coraz większym wyzwaniem. Zapotrzebowanie na energię elektryczną również podlega ciągłym zmianom ze względu na zwiększoną częstotliwość występowania ekstremalnych zjawisk pogodowych. W tym środowisku regulacyjnym Unia Europejska zaproponowała jednolity model regulacyjny oceny bezpieczeństwa systemu elektroenergetycznego, w którym kluczową rolę odgrywa ocena długoterminowej wystarczalności zasobów. Celem artykułu jest przedstawienie tego modelu, wskazując jakie są jego implikacje z punktu widzenia tworzenia polityki regulacyjnej dla rozwoju odnawialnych źródeł energii i celów dekarbonizacji.

Pobierz artykul
Słowa kluczowe: European Union; resource adequacy; electricity market; decarbonization (Unia Europejska; wystarczalność zasobów; rynek energii elektrycznej; dekarbonizacja)

Bibliografia

References/Bibliografia

ACER (2020a). Decision No 23/2020 of the European Union Agency for the Cooperation of Energy Regulators of 2 October 2020 on the methodology for calculating the value of lost load, the cost of new entry, and the reliability standard.

ACER (2020b). Decision No 24/2020 of the European Union Agency for the Cooperation of Energy Regulators of 2 October 2020 on the methodology for the European resource adequacy assessment.

Bagen, B. (2005). Reliability and cost/worth evaluation of generating systems utilizing wind and solar energy. [A PhD thesis, University of Saskatchewan, Saskatoon, Canada]. https://harvest.usask.ca/handle/10388/etd-08242005-211402

Billimoria, F., & Poudineh, R. (2019). Market design for resource adequacy: A reliability insurance overlay on energy-only electricity markets. Utilities Policy, 60, 100935.

Billinton, R., & Allan, R. N. (1984). Reliability Evaluation of Power Systems. Plenum Press.

Case T-167/19, Tempus Energy Germany and T Energy Sweden vs. European Commission, ECLI:EU:T:2021:645.

Case T-793/14, Tempus Energy Ltd and Tempus Energy Technology Ltd V European Commission, ECLI:EU:T:2018:790.

Council of European Energy Regulators (2014). Assessment of electricity generation adequacy in European countries. Report ref. C13-ESS-32-03 of 3rd March 2014. CEER.

Cramton, P., & Stoft, S. (2008). Forward reliability markets: less risk, less market power, more efficiency. Utility Policy, 16(3), 194–201.

Cramton, P., Ockenfels, A., & Stoft, S. (2013). Capacity Market Fundamentals, Economics of Energy & Environmental Policy, 2(2), 27–46.

De Vries, L., & Heijen, P. (2008). The impact of electricity market design upon investment under uncertainty: the effectiveness of capacity mechanisms. Utility Policy, 16(3), 215–227.

ENTSO-E (2017). Mid-term Adequacy Forecast, 2017 (MEF), ENTSO-E, https://consultations.entsoe.eu/systemdevelopment/mid-term-adequacyforecast2017/supporting_documents/MAF%202017%20report%20for%20consultation.pdf (22.11.2021).

ENTSO-E (2019). Methodology European Resource Adequacy Assessment — Methodology Proposal in accordance with Article 23 of the Electricity Regulation of the European Parliament and of the Council of 5 June 2019 on the internal market for electricity (recast), dated 5 December 2019, ENTSO-E.

ENTSO-E (2021). European Resource Adequacy Assessment 2021 Edition, ENTSO-E, https://eepublicdownloads.azureedge.net/cleandocuments/sdc-documents/ERAA/ERAA_2021_Executive%20Report.pdf

European Commission (2014). Decision of the European Commission of 23 July 2014, State Aid SA.35980 (2014/N-2) — United Kingdom Electricity Market Reform — Capacity market, C(2014) 5083 final.

European Commission (2016a). Decision of the European Commission of 8 November 2016 (France), case SA.39621 2015/C, C(2016) 7086 final.

European Commission (2016b) Decision of the European Commission of 24 October 2016 (Germany), case SA.43735 (2016/N), C(2016) 6765 final.

European Commission (2016c). Interim Report of the Sector Inquiry on Capacity Mechanisms (C(2016)2107 final, 13.04.2016).

European Commission (2018). Decision of the European Commission of 7 February 2018 (Poland), case SA.46100 (2017/N) C(2018) 601 final.

Fabra, N., von der Fehr, N.-H. M., & de Frutos, M.-A. (2011). Market Design and Investment Incentives. Economic Journal, 121(557), 1340–1360. https://doi.org/10.1111/j.1468-0297.2011.02450.x

González-Diaz, F. E. (2015). EU Policy on capacity mechanisms. In: L. Hancher, A. de Hauteclocque, & M. Sadowska (Eds.), Capacity mechanisms in the EU energy market. Law, policy, and economics (10–16). Oxford University Press.

Gross, R., Heptonstall, P., Anderson, D., Green, T., Leach, M., & Skea, J. (2006). The cost and impacts of intermittency: An assessment of the evidence on the costs and impacts of intermittent generation on the British electricity network. The UK Energy Research Centre.

Joskow, P. (2008). Capacity payments in imperfect electricity markets: Need and design. Utility Policy, 16, 159–170.

Joskow, P., & Tirole, J. (2007). Reliability and competitive electricity markets. RAND Journal of Economics, 38(1), 60–84. https://doi.org/10.1111/j.1756-2171.2007.tb00044.x

Khalfallah, M. H. (2011). A Game theoretic model for generation capacity adequacy: Comparison Between investment incentive mechanisms in electricity markets. The Energy Journal, 32(4), 117–157. http://dx.doi.org/10.2139/ssrn.1405291

Kim, H., & Kim S.-S. (2012). The resource adequacy scheme in the Korean electricity market. Energy Policy, 47, 133–144.

Küfeoglu, S., & Lehtonen, M. (2015). Comparison of different models for estimating the residential sector customer interruption costs. Electric Power Systems Research, 122, 50–55. https://doi.org/10.1016/j.epsr.2014.12.026

Mehrtash, A., Wang, P., & Goel, L. (2012). Reliability evaluation of power systems considering restructuring and renewable generators. IEEE Transactions on Power Systems, 27(1), 243–250. https://doi.org/10.1109/TPWRS.2011.2161350

Mohammad Rozali, N. E., Wan Alwi, S. R., Abdul Manan, Z., Klemeš, J. J., & Hassan, M. Y. (2013). Process integration of hybrid power systems with energy losses considerations. Energy, 55, 38–45. https://doi.org/10.1016/j.energy.2012.01.005

Petitet, M., Finon, D., & Janssen, T. (2017). Capacity adequacy in power market facing energy transition: A comparison of scarcity pricing and capacity mechanism. Energy Policy, 103, 30–46. https://doi.org/10.1016/j.enpol.2016.12.032

Regulation (EU) 2018/1999 of the European Parliament and of the Council of 11 December 2018 on the Governance of the Energy Union and Climate Action, amending Regulations (EC) No 663/2009 and (EC) No 715/2009 of the European Parliament and of the Council, Directives 94/22/EC, 98/70/EC, 2009/31/EC, 2009/73/EC, 2010/31/EU, 2012/27/EU and 2013/30/EU of the European Parliament and of the Council, Council Directives 2009/119/EC and (EU) 2015/652 and repealing Regulation (EU) No 525/2013 of the European Parliament and of the Council (OJ L 328, 21.12.2018, p. 1-77).

Regulation (EU) 2019/941 of the European Parliament and of the Council of 5 June 2019 on risk-preparedness in the electricity sector and repealing Directive 2005/89/EC (OJ L 158, 14.6.2019, p. 1).

Regulation (EU) 2019/943 of the European Parliament and of the Council of 5 June 2019 on the internal market for electricity (OJ L 158, 14.6.2019, p. 54-124).

Riesz, J., & Elliston, B. (2016). Research and deployment priorities for renewable technologies: Quantifying the importance of various renewable technologies for low cost, high renewable electricity systems in an Australian case study. Energy Policy, 98, 298–308. https://doi.org/10.1016/j.enpol.2016.08.034

Simoglou, C. K., Bakirtzis, E. A., Biskas, P. N., & Bakirtzis, A. G. (2018). Probabilistic evaluation of the long-term power system resource adequacy: The Greek case, Energy Policy, 117, 295–306. https://doi.org/10.1016/j.enpol.2018.02.047

Simoglou, C. K., Biskas, P. N., Vagropoulos, S. I., & Bakirtzis, A. G. (2014). Electricity market models and RES integration: The Greek case. Energy Policy, 67, 531–542. https://doi.org/10.1016/j.enpol.2013.11.065

Simshauser, P. (2019). Missing money, missing policy and resource adequacy in Australia's national electricity market. Utilities Policy, 60, 100936. https://doi.org/10.1016/j.jup.2019.100936

Simshauser, P., & Tiernan A. (2019). Climate change policy discontinuity and its effects on Australia's national electricity market. Australian Journal of Public Administration, 78(1), 17–36. https://doi.org/10.1111/1467-8500.12328

Singh, C., & Kim, Y. (1988). An efficient technique for reliability analysis of power systems including time dependent sources. IEEE Transactions on Power Systems, 3(3), 1090–1096. https://doi.org/10.1109/59.14567

Suchitra, D., Jegatheesan, R., & Deepika, T. J. (2016). Optimal design of hybrid power generation system and its integration in the distribution network. International Journal of Electrical Power & Energy Systems, 82, 136–149. https://doi.org/10.1016/j.ijepes.2016.03.005

THEMA Consulting Group (2013). E3M-Lab, COWI (2013). Capacity mechanisms in individual markets within the IEM, 23.05.2013, www.ec.europa.eu/energy/sites/ener/files/documents/20130207_generation_adequacy_study.pdf (Visited: 30.04.2019).

Tina, G. M., & Gagliano, S. (2011). Probabilistic modelling of hybrid solar/wind power system with solar tracking system. Renewable Energy, 36(6), 1719–1727. https://doi.org/10.1016/j.renene.2010.12.001

Tomasson, E., & Soder, L. (2018). Generation Adequacy Analysis of Multi-Area Power Systems With a High Share of Wind Power. IEEE Transactions on Power Systems, 33(4), 3854–3862. https://doi.org/10.1109/TPWRS.2017.2769840

Xu, Y., & Singh, C. (2012). Adequacy and economy analysis of distribution systems integrated with electric energy storage and renewable energy resources. IEEE Transactions on Power Systems, 27(4), 2332–2341. https://doi.org/10.1109/TPWRS.2012.2186830